The string had now been extended all the way to the ditch marking the intended grade of the soil. A lot of soil was removed and rocks moved into the hole. The rototiller was used to loosen rocks and then rocks were raked to one side and soil to the other side.

4 images are available.


Image file: photo01.jpg Image file: photo02.jpg Image file: photo03.jpg Image file: photo04.jpg