The footings are in. They are 7.5 foot poles with a big screw on the
bottom that a 6,000 lb machine puts in place. One hit a big rock so
sticks up a foot or so. They all need to be cut and a brace added for
either a short 6x6 or nominal 6 inch width of framing for the shorter
parts of the deck.